<?xml version="1.0" encoding="UTF-8" standalone="no"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD Journal Publishing DTD v2.3 20070202//EN" "journalpublishing.dtd">
<article xml:lang="EN" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink" article-type="review-article">
<front>
<journal-meta>
<journal-id journal-id-type="publisher-id">Bohr. Omrp.</journal-id>
<journal-title>BOHR International Journal of Operations Management Research and Practices</journal-title>
<abbrev-journal-title abbrev-type="pubmed">Bohr. Omrp.</abbrev-journal-title>
<issn pub-type="epub">2583-6420</issn>
<publisher>
<publisher-name>BOHR</publisher-name>
</publisher>
</journal-meta>
<article-meta>
<article-id pub-id-type="doi">10.54646/bijomrp.2022.09</article-id>
<article-categories>
<subj-group subj-group-type="heading">
<subject>Review</subject>
</subj-group>
</article-categories>
<title-group>
<article-title>Teaching forecasting and prediction</article-title>
</title-group>
<contrib-group>
<contrib contrib-type="author" corresp="yes">
<name><surname>Ozgur</surname> <given-names>Ceyhun</given-names></name>
<xref ref-type="aff" rid="aff1"><sup>1</sup></xref>
<xref ref-type="corresp" rid="c001"><sup>&#x002A;</sup></xref>
</contrib>
<contrib contrib-type="author">
<name><surname>Jha</surname> <given-names>Sanjeev</given-names></name>
<xref ref-type="aff" rid="aff2"><sup>2</sup></xref>
</contrib>
<contrib contrib-type="author">
<name><surname>Wallner</surname> <given-names>Madison</given-names></name>
<xref ref-type="aff" rid="aff3"><sup>3</sup></xref>
</contrib>
</contrib-group>
<aff id="aff1"><sup>1</sup><institution>Emeritus Professor of Information and Decision Sciences, Valparaiso University</institution></aff>
<aff id="aff2"><sup>2</sup><institution>Associate Professor of Information and Decision Sciences, Valparaiso University</institution></aff>
<aff id="aff3"><sup>3</sup><institution>Class of 2024 Meteorology Undergraduate, Valparaiso University</institution></aff>
<author-notes>
<corresp id="c001">&#x002A;Correspondence: Ceyhun Ozgur, <email>ceyhun.ozgur@valpo.edu</email></corresp>
</author-notes>
<pub-date pub-type="epub">
<day>04</day>
<month>10</month>
<year>2022</year>
</pub-date>
<volume>1</volume>
<issue>1</issue>
<fpage>77</fpage>
<lpage>83</lpage>
<history>
<date date-type="received">
<day>28</day>
<month>08</month>
<year>2022</year>
</date>
<date date-type="accepted">
<day>03</day>
<month>09</month>
<year>2022</year>
</date>
</history>
<permissions>
<copyright-statement>Copyright &#x00A9; 2022 Ozgur, Jha and Wallner.</copyright-statement>
<copyright-year>2022</copyright-year>
<copyright-holder>Ozgur, Jha and Wallner</copyright-holder>
<license xlink:href="https://creativecommons.org/licenses/by/4.0/"><p>This is an open-access article distributed under the terms of the Creative Commons Attribution License (CC BY). The use, distribution or reproduction in other forums is permitted, provided the original author(s) and the copyright owner(s) are credited and that the original publication in this journal is cited, in accordance with accepted academic practice. No use, distribution or reproduction is permitted which does not comply with these terms.</p></license>
</permissions>
<abstract>
<p>This manuscript aimed to materialize how to teach forecasting and predictions to undergraduate students. There are two modes of thinking, including the determination of forecasters and forecast errors. To determine the best forecast, we have to use the methodology of minimizing sums of forecast errors, which is further discussed in this manuscript. An example of this is single exponential smoothing, which is rather difficult when it comes to determining the smoothing constant alpha. In management and administrative situations, the need for planning is great because the lead time for decision-making ranges from several years to a few days or even a few hours. The ability to predict many types of events seems, as natural today as, to be the accurate forecasting of weather conditions in a few decades.</p>
</abstract>
<kwd-group>
<kwd>teaching forecasting</kwd>
<kwd>exponential smoothing</kwd>
<kwd>forecast errors</kwd>
<kwd>prediction</kwd>
</kwd-group>
<counts>
<fig-count count="5"/>
<table-count count="10"/>
<equation-count count="0"/>
<ref-count count="23"/>
<page-count count="7"/>
<word-count count="3907"/>
</counts>
</article-meta>
</front>
<body>
<sec id="S1" sec-type="intro">
<title>1. Introduction</title>
<p>The &#x201C;predict&#x201D; comes from Latin descent, meaning to say or do in advance (<xref ref-type="bibr" rid="B1">1</xref>). The word &#x201C;forecast&#x201D; comes from the English Germanic root, meaning to calculate some future event or condition (<xref ref-type="bibr" rid="B2">2</xref>). Together, forecasting is the ability to predict the future. Teaching forecasting and prediction are done by utilizing the latest and most cost-efficient financial tools to optimize the financial cost of specific organizations and predict the financial situation of the specific organization to flourish (<xref ref-type="bibr" rid="B3">3</xref>). The first mode is System one, which is automatic and fast and has constant low-level predictions. The second mode is System two, which is effortful and has complex computations. In this manuscript, we are going to discuss how we calculate the forecast error and how to teach forecasting using simple exponential smoothing and a linear regression procedure.</p>
</sec>
<sec id="S2">
<title>2. Forecast error</title>
<p>The analysis of the accuracy of forecasts over a set period of time series is of much importance, due to forecasting function that is evaluated as inappropriate techniques. Therefore, the link to economic evaluation is changed (<xref ref-type="bibr" rid="B4">4</xref>). To determine the best forecast, we have to minimize the sum of the forecast errors. We first came up with the forecasted demand (Fi) and compared it with the actual demand (Ai). This is called the &#x201C;Forecast Error,&#x201D; which is equivalent to <italic>e</italic> = Ai-Fi. Then, once we come up with the forecast error, we can then determine the sum of the forecast errors. This equation is given by (Ai-Fi). The firm or organization provides us with the actual demand, but it is up to us to establish the predicted demand. The method used by each business or organization to determine the anticipated demand varies. For instance, Fi = Ai-1 means that the predicted demand might be identical to the actual demand from the prior period.</p>
</sec>
<sec id="S3">
<title>3. Single exponential smoothing</title>
<p>Single exponential smoothing shows a class of forecasting methods that show a variety of the most successful forecasting methods that are reliant on exponential smoothing. There are multiple methods that can be considered exponential smoothing, dealing with the fact that forecasts are weighted combinations of commercial observations. This type of forecasting is based on determining the smoothing constant alpha (<xref ref-type="bibr" rid="B5">5</xref>, <xref ref-type="bibr" rid="B6">6</xref>). This equation is given by Fi = ??Xi + (1-??)Fi. The hardest part of utilizing single exponential smoothing in forecasting and prediction is determining the smoothing constant alpha. The larger the value of &#x03B1; or closer to 1, the less smoothed it is, and the smaller the value of &#x03B1; or closer to 0, the more smooth it is. Since the aforementioned smoothing calculations are straightforward and only a minimal amount of historical information should be preserved from one prediction to the next, it is possible to employ higher-order polynomials as forecasting models. (<xref ref-type="bibr" rid="B7">7</xref>).</p>
<p><bold>Example 3.1:</bold> Let us take a situation with the following demand values 10, 12, 14, 15 and smoothing constant ?? = 0.1. Let us determine the forecasted demand with these given values. Assume that the first forecast is the same as the actual demand, which is 10.</p>
<p>The forecast for 2019 is 10, so the forecast for 2020 is (0.1&#x002A;10). So:</p>
<p>Forecast i + 1 = (&#x03B1;&#x002A;Actuali) + (1&#x2013;&#x03B1;)&#x002A;Forecasti</p>
<p>Forecast 20 = (&#x03B1;&#x002A;Actual19) + (1&#x2013;&#x03B1;)&#x002A;Forecast19</p>
<p>F20 = (0.1&#x002A;10) + (1&#x2013;0.1)&#x002A;10 = 10</p>
<p>A20 = 12</p>
<p>The Forecast for 2021 is<underline>:</underline></p>
<p>Forecast i + 1 = (&#x03B1;&#x002A;Actuali) + (1&#x2013;&#x03B1;)&#x002A;Forecasti</p>
<p>Forecast 21 = (&#x03B1;&#x002A;Actual20) + (1&#x2013;&#x03B1;)&#x002A;Forecast20</p>
<p>F21 = (0.1&#x002A;12) + (1&#x2212;0.1)&#x002A;10 = 10.2</p>
<p>The Forecast for 2022 is:</p>
<p>Forecast i + 1 = (&#x03B1;&#x002A;Actuali) + (1&#x2013;&#x03B1;)&#x002A;Forecasti</p>
<p>Forecast 22 = (&#x03B1;&#x002A;Actual21) + (1&#x2013;&#x03B1;)&#x002A;Forecast21</p>
<p>F21 = (0.1&#x002A;14) + (1&#x2212;0.1)&#x002A;10.2 = 10.58</p>
<p>The Forecast for 2023 is:</p>
<p>Forecast i + 1 = (&#x03B1;&#x002A;Actuali) + (1&#x2013;&#x03B1;)&#x002A;Forecasti</p>
<p>Forecast 23 = (&#x03B1;&#x002A;Actual22) + (1&#x2013;&#x03B1;)&#x002A;Forecast22</p>
<p>F21 = (0.1&#x002A;15) + (1&#x2212;0.1)&#x002A;10.58 = 11.02.</p>
</sec>
<sec id="S4">
<title>4. Regression analysis</title>
<p>We can also determine the forecast error by determining the forecast with a different procedure. The most common procedure that is used is the linear regression procedure.</p>
<p>Regression analysis is one of the most widely used techniques for reviewing multi-factor data.</p>
<p>Its familiarity and ability to predict come from a conceptual process of prediction utilizing an equation expressing relationships between a variable of interest and a set of other predictability variables (<xref ref-type="bibr" rid="B8">8</xref>). In a linear regression procedure, we have to come up with the equation for Fi. This can also be stated as Y = a + bX, where a is the y-intercept, b is the slope, X is the value of the forecast, and Y is the forecasted value of demand, which can also be stated as F.</p>
<p>Along with this, there is also robust regression. This is the same as linear regression but on a more &#x201C;robust&#x201D; scale. Some factors that are important when doing robust regression analysis are to protect against distortion by anomalous and good efficiency when the data come from the ideal Gaussian model, as well as from a range of other similar models (<xref ref-type="bibr" rid="B9">9</xref>). Regardless of which regression we decide to utilize, they are all very similar to one another when it comes to forecasting and prediction.</p>
<p><bold>Example 4.1:</bold> The waiting time (in minutes) for bank customers wanting to sign up for a loan was measured at four banks for all customers who arrived between 2:00 and 2:30 p.m. on a certain Wednesday. The results are shown below.</p>
<p><bold>Example 4.2:</bold> A real estate appraiser is developing a regression model to predict the selling price in a certain neighborhood. She is planning to use square footage as a variable, but she also wishes to incorporate the type of house (Colonial = 0, Tudor = 1, or Contemporary = 1) and whether the house has a brick front (brick = 1, no brick = 0). She obtains the following data.</p>
<p><bold>Example 4.3:</bold> We are using air passengers&#x2019; data to show an example of forecasting using R. The advantage of using R or Python is that the syntax can be reused with little changes for new data or new cases. Comment lines are pre-fixed with a # sign.</p>
<table-wrap position="float" id="T1">
<label>TABLE 1</label>
<caption><p>Bank waiting time (minutes).</p></caption>
<table cellspacing="5" cellpadding="5" frame="hsides" rules="groups">
<thead>
<tr>
<td valign="top" align="left">Bank 1<break/> (5 customers)</td>
<td valign="top" align="center">Bank 2<break/> (4 customers)</td>
<td valign="top" align="center">Bank 3<break/> (7 customers)</td>
<td valign="top" align="center">Bank 4<break/> (6 customers)</td>
</tr>
</thead>
<tbody>
<tr>
<td valign="top" align="left">10</td>
<td valign="top" align="center">8</td>
<td valign="top" align="center">5</td>
<td valign="top" align="center">1</td>
</tr>
<tr>
<td valign="top" align="left">19</td>
<td valign="top" align="center">25</td>
<td valign="top" align="center">11</td>
<td valign="top" align="center">20</td>
</tr>
<tr>
<td valign="top" align="left">5</td>
<td valign="top" align="center">17</td>
<td valign="top" align="center">24</td>
<td valign="top" align="center">9</td>
</tr>
<tr>
<td valign="top" align="left">26</td>
<td valign="top" align="center">36</td>
<td valign="top" align="center">16</td>
<td valign="top" align="center">5</td>
</tr>
<tr>
<td valign="top" align="left">11</td>
<td valign="top" align="center"/>
<td valign="top" align="center">18</td>
<td valign="top" align="center">10</td>
</tr>
<tr>
<td valign="top" align="left"/>
<td valign="top" align="center"/>
<td valign="top" align="center">29</td>
<td valign="top" align="center">12</td>
</tr>
<tr>
<td valign="top" align="left"/>
<td valign="top" align="center"/>
<td valign="top" align="center">15</td>
<td valign="top" align="center"/></tr>
</tbody>
</table>
<table-wrap-foot>
<fn><p><italic>Research question:</italic></p></fn>
<fn><p>Are the mean waiting times for the bank customers the same for all four banks?</p></fn>
<fn><p><italic>Answer: (Using MINITAB)</italic></p></fn>
<fn><p>The mean waiting times for the bank customers are the same for all four banks because the <italic>F</italic>-value calculated is 1.76, which is less than 3.16 from the <italic>F</italic>-table. Therefore, there is no significant difference in waiting times between the four banks.</p></fn>
</table-wrap-foot>
</table-wrap>
<table-wrap position="float" id="T2">
<label>TABLE 2</label>
<caption><p>Analysis of variance.</p></caption>
<table cellspacing="5" cellpadding="5" frame="hsides" rules="groups">
<thead>
<tr>
<td valign="top" align="left">Source</td>
<td valign="top" align="center">DF</td>
<td valign="top" align="center">Adj SS</td>
<td valign="top" align="center">Adj MS</td>
<td valign="top" align="center"><italic>F</italic>-Value</td>
<td valign="top" align="center"><italic>P</italic>-Value</td>
</tr>
</thead>
<tbody>
<tr>
<td valign="top" align="left">Factor</td>
<td valign="top" align="center">3</td>
<td valign="top" align="center">377.7</td>
<td valign="top" align="center">125.89</td>
<td valign="top" align="center">1.76</td>
<td valign="top" align="center">0.191</td>
</tr>
<tr>
<td valign="top" align="left">Error</td>
<td valign="top" align="center">18</td>
<td valign="top" align="center">1,288.2</td>
<td valign="top" align="center">71.56</td>
<td valign="top" align="center"/>
<td valign="top" align="center"/></tr>
<tr>
<td valign="top" align="left">Total</td>
<td valign="top" align="center">21</td>
<td valign="top" align="center">1,665.8</td>
<td valign="top" align="center"/>
<td valign="top" align="center"/>
<td valign="top" align="center"/></tr>
</tbody>
</table></table-wrap>
<table-wrap position="float" id="T3">
<label>TABLE 3</label>
<caption><p>Model summary.</p></caption>
<table cellspacing="5" cellpadding="5" frame="hsides" rules="groups">
<thead>
<tr>
<td valign="top" align="left">S</td>
<td valign="top" align="center">R-sq</td>
<td valign="top" align="center">R-sq(adj)</td>
<td valign="top" align="center">R-sq(pred)</td>
</tr>
</thead>
<tbody>
<tr>
<td valign="top" align="left">8.45957</td>
<td valign="top" align="center">22.67%</td>
<td valign="top" align="center">9.78%</td>
<td valign="top" align="center">0.00%</td>
</tr>
</tbody>
</table></table-wrap>
<table-wrap position="float" id="T4">
<label>TABLE 4</label>
<caption><p>Means (<xref ref-type="fig" rid="F1">Figure 1</xref>).</p></caption>
<table cellspacing="5" cellpadding="5" frame="hsides" rules="groups">
<thead>
<tr>
<td valign="top" align="left">Factor</td>
<td valign="top" align="center">N</td>
<td valign="top" align="center">Mean</td>
<td valign="top" align="center">StDev</td>
<td valign="top" align="center">95% CI</td>
</tr>
</thead>
<tbody>
<tr>
<td valign="top" align="left">C1</td>
<td valign="top" align="center">5</td>
<td valign="top" align="center">14.20</td>
<td valign="top" align="center">8.29</td>
<td valign="top" align="center">(6.25, 22.15)</td>
</tr>
<tr>
<td valign="top" align="left">C2</td>
<td valign="top" align="center">4</td>
<td valign="top" align="center">21.50</td>
<td valign="top" align="center">11.90</td>
<td valign="top" align="center">(12.61, 30.39)</td>
</tr>
<tr>
<td valign="top" align="left">C3</td>
<td valign="top" align="center">7</td>
<td valign="top" align="center">16.86</td>
<td valign="top" align="center">7.95</td>
<td valign="top" align="center">(10.14, 23.57)</td>
</tr>
<tr>
<td valign="top" align="left">C4</td>
<td valign="top" align="center">6</td>
<td valign="top" align="center">9.50</td>
<td valign="top" align="center">6.47</td>
<td valign="top" align="center">(2.24, 16.76)</td>
</tr>
</tbody>
</table>
<table-wrap-foot>
<fn><p>Pooled StDev = 8.45957</p></fn>
</table-wrap-foot>
</table-wrap>
<table-wrap position="float" id="T5">
<label>TABLE 5</label>
<caption><p>Regression analysis coefficients.</p></caption>
<table cellspacing="5" cellpadding="5" frame="hsides" rules="groups">
<thead>
<tr>
<td valign="top" align="left">Area (sq. ft.)</td>
<td valign="top" align="center">Type</td>
<td valign="top" align="center">Brick</td>
<td valign="top" align="center">Price (&#x0024;000)</td>
</tr>
</thead>
<tbody>
<tr>
<td valign="top" align="left">2,100</td>
<td valign="top" align="center">Contemporary</td>
<td valign="top" align="center">No</td>
<td valign="top" align="center">85</td>
</tr>
<tr>
<td valign="top" align="left">2,400</td>
<td valign="top" align="center">Tudor</td>
<td valign="top" align="center">Yes</td>
<td valign="top" align="center">110</td>
</tr>
<tr>
<td valign="top" align="left">2,396</td>
<td valign="top" align="center">Colonial</td>
<td valign="top" align="center">Yes</td>
<td valign="top" align="center">115</td>
</tr>
<tr>
<td valign="top" align="left">3,000</td>
<td valign="top" align="center">Tudor</td>
<td valign="top" align="center">Yes</td>
<td valign="top" align="center">175</td>
</tr>
<tr>
<td valign="top" align="left">2,850</td>
<td valign="top" align="center">Tudor</td>
<td valign="top" align="center">Yes</td>
<td valign="top" align="center">160</td>
</tr>
<tr>
<td valign="top" align="left">2,500</td>
<td valign="top" align="center">Contemporary</td>
<td valign="top" align="center">No</td>
<td valign="top" align="center">135</td>
</tr>
<tr>
<td valign="top" align="left">2,000</td>
<td valign="top" align="center">Colonial</td>
<td valign="top" align="center">No</td>
<td valign="top" align="center">79</td>
</tr>
<tr>
<td valign="top" align="left">2,200</td>
<td valign="top" align="center">Colonial</td>
<td valign="top" align="center">No</td>
<td valign="top" align="center">89</td>
</tr>
<tr>
<td valign="top" align="left">2,600</td>
<td valign="top" align="center">Contemporary</td>
<td valign="top" align="center">No</td>
<td valign="top" align="center">98</td>
</tr>
<tr>
<td valign="top" align="left">2,400</td>
<td valign="top" align="center">Colonial</td>
<td valign="top" align="center">No</td>
<td valign="top" align="center">105</td>
</tr>
<tr>
<td valign="top" align="left">2,900</td>
<td valign="top" align="center">Tudor</td>
<td valign="top" align="center">Yes</td>
<td valign="top" align="center">154</td>
</tr>
</tbody>
</table>
<table-wrap-foot>
<fn><p><italic>Research Question:</italic></p></fn>
<fn><p>(a) State the model that uses indicator variables.</p></fn>
<fn><p>(b) Estimate the model, using the given data.</p></fn>
<fn><p>(c) Interpret the values of the coefficients and constant terms.</p></fn>
<fn><p><italic>Answer: (Using MINITAB)</italic></p></fn>
<fn><p>(a) Variable Definitions:</p></fn>
<fn><p>Y = Price</p></fn>
<fn><p>X1 = 1, if contemporary</p></fn>
<fn><p>X1 = 0, otherwise</p></fn>
<fn><p>X2 = 1, if Tudor</p></fn>
<fn><p>X2 = 0, otherwise</p></fn>
<fn><p>X3 = 1, if brick</p></fn>
<fn><p>X3 = 0, if not brick</p></fn>
<fn><p>X4 = Area</p></fn>
<fn><p>(b) <italic>Y</italic> = &#x2212;85.7, C1 = 0.0803, C2 = &#x2212;1.1, C3 = 3.3, C4 = 8.3</p></fn>
<fn><p>(c) Constant term is &#x2212;85.7, contemporary houses have an expected price increase of 0.0803, Tudor houses have an expected price increase of 1.1, the houses with a brick front have an expected price increase of 3.3, and each square foot increases the expected price of the house by 8.3.</p></fn>
</table-wrap-foot>
</table-wrap>
<table-wrap position="float" id="T6">
<label>TABLE 6</label>
<caption><p>Regression equation.</p></caption>
<table cellspacing="5" cellpadding="5" frame="hsides" rules="groups">
<thead>
<tr>
<td valign="top" align="left">C2</td>
<td valign="top" align="center">C3</td>
<td valign="top" align="center">C4</td>
<td valign="top" align="center"/>
<td valign="top" align="center"/>
<td valign="top" align="center"/></tr>
</thead>
<tbody>
<tr>
<td valign="top" align="left">0</td>
<td valign="top" align="center">0</td>
<td valign="top" align="center">0</td>
<td valign="top" align="center">C5</td>
<td valign="top" align="center">=</td>
<td valign="top" align="center">&#x2212;85.7 + 0.0803 C1</td>
</tr>
<tr>
<td valign="top" align="left">0</td>
<td valign="top" align="center">0</td>
<td valign="top" align="center">1</td>
<td valign="top" align="center">C5</td>
<td valign="top" align="center">=</td>
<td valign="top" align="center">&#x2212;77.4 + 0.0803 C1</td>
</tr>
<tr>
<td valign="top" align="left">0</td>
<td valign="top" align="center">1</td>
<td valign="top" align="center">0</td>
<td valign="top" align="center">C5</td>
<td valign="top" align="center">=</td>
<td valign="top" align="center">&#x2212;82.4 + 0.0803 C1</td>
</tr>
<tr>
<td valign="top" align="left">0</td>
<td valign="top" align="center">1</td>
<td valign="top" align="center">1</td>
<td valign="top" align="center">C5</td>
<td valign="top" align="center">=</td>
<td valign="top" align="center">&#x2212;74.1 + 0.0803 C1</td>
</tr>
<tr>
<td valign="top" align="left">1</td>
<td valign="top" align="center">0</td>
<td valign="top" align="center">0</td>
<td valign="top" align="center">C5</td>
<td valign="top" align="center">=</td>
<td valign="top" align="center">&#x2212;86.8 + 0.0803 C1</td>
</tr>
<tr>
<td valign="top" align="left">1</td>
<td valign="top" align="center">0</td>
<td valign="top" align="center">1</td>
<td valign="top" align="center">C5</td>
<td valign="top" align="center">=</td>
<td valign="top" align="center">&#x2212;78.5 + 0.0803 C1</td>
</tr>
<tr>
<td valign="top" align="left">1</td>
<td valign="top" align="center">1</td>
<td valign="top" align="center">0</td>
<td valign="top" align="center">C5</td>
<td valign="top" align="center">=</td>
<td valign="top" align="center">&#x2212;83.5 + 0.0803 C1</td>
</tr>
<tr>
<td valign="top" align="left">1</td>
<td valign="top" align="center">1</td>
<td valign="top" align="center">1</td>
<td valign="top" align="center">C5</td>
<td valign="top" align="center">=</td>
<td valign="top" align="center">&#x2212;75.2 + 0.0803 C1</td>
</tr>
</tbody>
</table></table-wrap>
<table-wrap position="float" id="T7">
<label>TABLE 7</label>
<caption><p>Coefficients.</p></caption>
<table cellspacing="5" cellpadding="5" frame="hsides" rules="groups">
<thead>
<tr>
<td valign="top" align="left">Term</td>
<td valign="top" align="center">Coefficient</td>
<td valign="top" align="center">SE coefficient</td>
<td valign="top" align="center"><italic>T</italic>-Value</td>
<td valign="top" align="center"><italic>P</italic>-Value</td>
<td valign="top" align="center">VIF</td>
</tr>
</thead>
<tbody>
<tr>
<td valign="top" align="left">Constant</td>
<td valign="top" align="center">&#x2212;85.7</td>
<td valign="top" align="center">48.9</td>
<td valign="top" align="center">&#x2212;1.75</td>
<td valign="top" align="center">0.130</td>
<td valign="top" align="center"/></tr>
<tr>
<td valign="top" align="left">C1</td>
<td valign="top" align="center">0.0803</td>
<td valign="top" align="center">0.0219</td>
<td valign="top" align="center">3.66</td>
<td valign="top" align="center">0.011</td>
<td valign="top" align="center">2.48</td>
</tr>
<tr>
<td valign="top" align="left">C2</td>
<td valign="top" align="center"/>
<td valign="top" align="center"/>
<td valign="top" align="center"/>
<td valign="top" align="center"/>
<td valign="top" align="center"/></tr>
<tr>
<td valign="top" align="left">1</td>
<td valign="top" align="center">&#x2212;1.1</td>
<td valign="top" align="center">12.6</td>
<td valign="top" align="center">&#x2212;0.08</td>
<td valign="top" align="center">0.935</td>
<td valign="top" align="center">1.66</td>
</tr>
<tr>
<td valign="top" align="left">C3</td>
<td valign="top" align="center"/>
<td valign="top" align="center"/>
<td valign="top" align="center"/>
<td valign="top" align="center"/>
<td valign="top" align="center"/></tr>
<tr>
<td valign="top" align="left">1</td>
<td valign="top" align="center">3.3</td>
<td valign="top" align="center">18.2</td>
<td valign="top" align="center">0.18</td>
<td valign="top" align="center">0.862</td>
<td valign="top" align="center">4.09</td>
</tr>
<tr>
<td valign="top" align="left">C4</td>
<td valign="top" align="center"/>
<td valign="top" align="center"/>
<td valign="top" align="center"/>
<td valign="top" align="center"/>
<td valign="top" align="center"/></tr>
<tr>
<td valign="top" align="left">1</td>
<td valign="top" align="center">8.3</td>
<td valign="top" align="center">17.2</td>
<td valign="top" align="center">0.48</td>
<td valign="top" align="center">0.648</td>
<td valign="top" align="center">3.88</td>
</tr>
</tbody>
</table></table-wrap>
<table-wrap position="float" id="T8">
<label>TABLE 8</label>
<caption><p>Model summary.</p></caption>
<table cellspacing="5" cellpadding="5" frame="hsides" rules="groups">
<thead>
<tr>
<td valign="top" align="left">S</td>
<td valign="top" align="center">R^2</td>
<td valign="top" align="center">R^2 (adjusted)</td>
<td valign="top" align="center">R^2 (predicted)</td>
</tr>
</thead>
<tbody>
<tr>
<td valign="top" align="left">14.4032</td>
<td valign="top" align="center">88.35%</td>
<td valign="top" align="center">80.59%</td>
<td valign="top" align="center"/></tr>
</tbody>
</table></table-wrap>
<table-wrap position="float" id="T9">
<label>TABLE 9</label>
<caption><p>Analysis of variance.</p></caption>
<table cellspacing="5" cellpadding="5" frame="hsides" rules="groups">
<thead>
<tr>
<td valign="top" align="left">Source</td>
<td valign="top" align="center">Degrees of freedom</td>
<td valign="top" align="center">Adjusted sum of squares</td>
<td valign="top" align="center">Adjusted means squared</td>
<td valign="top" align="center"><italic>F</italic>-Value</td>
<td valign="top" align="center"><italic>P</italic>-Value</td>
</tr>
</thead>
<tbody>
<tr>
<td valign="top" align="left">Regression</td>
<td valign="top" align="center">4</td>
<td valign="top" align="center">9,441.8</td>
<td valign="top" align="center">2,360.46</td>
<td valign="top" align="center">11.38</td>
<td valign="top" align="center">0.006</td>
</tr>
<tr>
<td valign="top" align="left">C1</td>
<td valign="top" align="center">1</td>
<td valign="top" align="center">2,786.0</td>
<td valign="top" align="center">2,786.04</td>
<td valign="top" align="center">13.43</td>
<td valign="top" align="center">0.011</td>
</tr>
<tr>
<td valign="top" align="left">C2</td>
<td valign="top" align="center">1</td>
<td valign="top" align="center">1.5</td>
<td valign="top" align="center">1.49</td>
<td valign="top" align="center">0.01</td>
<td valign="top" align="center">0.935</td>
</tr>
<tr>
<td valign="top" align="left">C3</td>
<td valign="top" align="center">1</td>
<td valign="top" align="center">6.8</td>
<td valign="top" align="center">6.81</td>
<td valign="top" align="center">0.03</td>
<td valign="top" align="center">0.862</td>
</tr>
<tr>
<td valign="top" align="left">C4</td>
<td valign="top" align="center">1</td>
<td valign="top" align="center">47.9</td>
<td valign="top" align="center">47.94</td>
<td valign="top" align="center">0.23</td>
<td valign="top" align="center">0.648</td>
</tr>
<tr>
<td valign="top" align="left">Error</td>
<td valign="top" align="center">6</td>
<td valign="top" align="center">1,244.7</td>
<td valign="top" align="center">207.45</td>
<td valign="top" align="center"/>
<td valign="top" align="center"/></tr>
<tr>
<td valign="top" align="left">Total</td>
<td valign="top" align="center">10</td>
<td valign="top" align="center">1,0686.5</td>
<td valign="top" align="center"/>
<td valign="top" align="center"/>
<td valign="top" align="center"/></tr>
</tbody>
</table></table-wrap>
<table-wrap position="float" id="T10">
<label>TABLE 10</label>
<caption><p>Fits and diagnostics for unusual observations.</p></caption>
<table cellspacing="5" cellpadding="5" frame="hsides" rules="groups">
<thead>
<tr>
<td valign="top" align="left">Observations</td>
<td valign="top" align="center">C5</td>
<td valign="top" align="center">Fit</td>
<td valign="top" align="center">Residual</td>
<td valign="top" align="center">Standard deviation of<break/> residual</td>
</tr>
</thead>
<tbody>
<tr>
<td valign="top" align="left">3</td>
<td valign="top" align="center">115.0</td>
<td valign="top" align="center">115.0</td>
<td valign="top" align="center">&#x2212;0.0</td>
<td valign="top" align="center"/></tr>
<tr>
<td valign="top" align="left">9</td>
<td valign="top" align="center">98.0</td>
<td valign="top" align="center">122.1</td>
<td valign="top" align="center">24.1</td>
<td valign="top" align="center">&#x2212;2.21 R</td>
</tr>
</tbody>
</table></table-wrap>
<p># Linear regression analysis air passenger dataset</p>
<p>ap = AirPassengers</p>
<p># install forecast</p>
<p>install.packages(&#x201C;forecast&#x201D;)</p>
<p># Load forecast package</p>
<p>library(forecast)</p>
<p># structure of the dataset</p>
<p>str(ap)</p>
<p># view the dataset</p>
<p>View(ap)</p>
<p># Plotting raw time series data (<xref ref-type="fig" rid="F2">Figure 2</xref>).</p>
<fig id="F1" position="float">
<label>FIGURE 1</label>
<caption><p>Interval plot of comparison of means.</p></caption>
<graphic mimetype="image" mime-subtype="tiff" xlink:href="bijomrp-2022-09-g001.tif"/>
</fig>
<fig id="F2" position="float">
<label>FIGURE 2</label>
<caption><p>Air passengers over time.</p></caption>
<graphic mimetype="image" mime-subtype="tiff" xlink:href="bijomrp-2022-09-g002.tif"/>
</fig>
<p>plot(ap, main = &#x201C;Airpassengers Over Time,&#x201D; ylab = &#x201C;Passengers&#x201D;)</p>
<p># Creating training dataset</p>
<p>train = window(ap, end = c(1,959,12))</p>
<p># start and end date training data</p>
<p>start(train)</p>
<p>end(train)</p>
<p># Creating test dataset</p>
<p>test = window(ap, start = c(1,960,1))</p>
<p>test</p>
<p>length(test)</p>
<p># Model 1: Additive Trend and seasonality (<xref ref-type="fig" rid="F3">Figure 3</xref>)</p>
<fig id="F3" position="float">
<label>FIGURE 3</label>
<caption><p>Additive trend and seasonality.</p></caption>
<graphic mimetype="image" mime-subtype="tiff" xlink:href="bijomrp-2022-09-g003.tif"/>
</fig>
<p># Plotting the complete dataset</p>
<p>plot(ap, main = &#x201C;Airpassengers Over Time,&#x201D; ylab = &#x201C;Passengers&#x201D;)</p>
<p>model1 = tslm(train &#x223C; trend + season)</p>
<p>summary(model1)</p>
<p>lines(model1&#x0024;fitted.values, col = &#x201C;red,&#x201D; lwd = 2)</p>
<p># forecast</p>
<p>pred1 = forecast(model1, h = 12)</p>
<p>pred1</p>
<p>lines(pred1&#x0024;mean, col = &#x201C;blue,&#x201D; lwd = 2).</p>
<p># accuracy</p>
<p>accuracy(pred1, test)</p>
<p># Model 2: Multiplicative Trend and Seasonality (<xref ref-type="fig" rid="F4">Figure 4</xref>)</p>
<fig id="F4" position="float">
<label>FIGURE 4</label>
<caption><p>Multiplicative trend and seasonality.</p></caption>
<graphic mimetype="image" mime-subtype="tiff" xlink:href="bijomrp-2022-09-g004.tif"/>
</fig>
<p># Plotting the complete dataset</p>
<p>plot(ap, main = &#x201C;Airpassengers Over Time,&#x201D; ylab = &#x201C;Passengers&#x201D;)</p>
<p>model2 = tslm(train &#x223C; trend + season, lambda = 0)</p>
<p>summary(model2)</p>
<p>lines(model2&#x0024;fitted.values, col = &#x201C;red,&#x201D; lwd = 2)</p>
<p># forecast</p>
<p>pred2 = forecast(model2, h = 12)</p>
<p>pred2</p>
<p>lines(pred2&#x0024;mean, col = &#x201C;blue,&#x201D; lwd = 2)</p>
<p># accuracy</p>
<p>accuracy(pred2, test).</p>
</sec>
<sec id="S5">
<title>5. Discriminant analysis</title>
<p>Discriminant analysis is a complete measurement of the difference between a categorical variable and a set of related variables. Essentially, discriminant analysis involves pattern recognition, which is a key to forecasting and prediction (<xref ref-type="bibr" rid="B10">10</xref>). However, there are two extremes when it comes to determinant analysis. The first being at the decision end of the scale, descriptive discriminant analysis intends to understand and predict the factors that determine group separation, and on the basis of a set of variables (entities) for which the group membership is already known. In contrast, the prescriptive discriminant analysis focuses on the classification of future variables (entities) of which the group membership is unknown. However, everyday discriminant analysis lies in between these two extremes, usually having to deal with no assignment or allocation when the groups are known to the researcher (<xref ref-type="bibr" rid="B11">11</xref>). When dealing with discriminant analysis, it is important to note error rates, posterior probabilities, and basic notation when utilizing this forecasting method. There are various familiar techniques such as linear discriminant and quadratic rules that show the relationship of estimates and mean and covariance parameters (<xref ref-type="bibr" rid="B12">12</xref>).</p>
</sec>
<sec id="S6">
<title>6. Teaching forecasting and prediction over the years</title>
<p>The decision-making can be as few as hours, but as many as days or weeks. This is why the need for planning is great in management and administrative situations. Old methods such as time series and ratio methods are classified as &#x201C;passive&#x201D; methods with no control (<xref ref-type="bibr" rid="B13">13</xref>). Through the time series, the use of regression and simulation is often &#x201C;active,&#x201D; and they can also be &#x201C;passive&#x201D; at times. However, it should be noted that throughout the last few centuries, predicting has made significant advancements. The advancement of research has expanded our awareness of diverse environmental factors, which has boosted our capacity to forecast many different events. Today, the capacity to foresee a variety of occurrences appears as natural as how accurate weather forecasting will be in a few decades (<xref ref-type="bibr" rid="B14">14</xref>). Despite these upgrades, two crucial points should be remembered. The first is that managers and others may not always immediately benefit from accurate forecasting, and the second is the distinction between external events that are out of one&#x2019;s control and internal ones that one can influence. Both kinds of events are necessary for a business to succeed, but predicting is only relevant to the former while decision-making is only relevant to the latter. The connection that joins them is planning.</p>
</sec>
<sec id="S7">
<title>7. Efficient use of resources</title>
<p>The scheduling of production, transportation, money, employees, and other factors is necessary for the efficient utilization of resources. A key component of such scheduling is forecasts of the degree of demand for products, materials, labor, funding, or services. The lead time for purchasing new machinery and equipment, employing new employees, and sourcing raw materials might range from a few days to many years. The initial goal was to identify significant contributions, application areas, constraints, and research and application suggestions for the area&#x2019;s future study. The second objective was to explain control models in terms of production management (<xref ref-type="bibr" rid="B15">15</xref>).</p>
<p>Forecasting is crucial to examine the need for future resource requirements. Long-term and short-term forecasting differs among organizations, and they must determine what is used in long term. Such decisions depend on market opportunities, environmental factors, and the internal development of financial, human product, and technological resources. These determinations all require good forecasts and managers who can interpret the predictions and make appropriate decisions. <xref ref-type="fig" rid="F5">Figure 5</xref> shows the use of the flow of resources from planning, to action, to future, and finally its impact.</p>
<fig id="F5" position="float">
<label>FIGURE 5</label>
<caption><p>Use of resource flow chart.</p></caption>
<graphic mimetype="image" mime-subtype="tiff" xlink:href="bijomrp-2022-09-g005.tif"/>
</fig>
<p>Regardless of what problems are being studied, it is important to provide an efficient algorithm or an algorithm with worst-case and performance analyses. Similarly, computational experiments demonstrate that the heuristics developed are capable of generating near-optimal solutions for any problem desired (<xref ref-type="bibr" rid="B16">16</xref>). With new models and new solution strategies, this can be extremely helpful for decision-making and for future research in areas of production scheduling and planning. This is important to support decision makers by improving their resource planning and scheduling system (<xref ref-type="bibr" rid="B17">17</xref>). If forecasting is to be successful, it is essential to recognize the strong dependency that exists between the predictions of different divisions or departments. The following instances may be impacted by errors in sale predictions through a chain of events: operational costs, cash flows, inventory inventories, and price forecasts. Similar budgeting mistakes in estimating the amount of funding available to each division will have an impact on product development, equipment modernization, staff employment, and advertising expenses. In turn, this will have an impact on, if not really dictate, how much money will flow in and out of the business. Clearly, the many forecasting functions within an organization are highly interdependent.</p>
</sec>
<sec id="S8">
<title>8. Difference between artificial intelligence and machine language</title>
<p>Artificial intelligence tries to determine the forecasted demand using the human brain while machine language can also determine the forecast error by using a computer program that functions like a machine. Artificial intelligence tries to develop learning models using the idea of the human brain, in particular, the ideas of neurons and connection, such as perceptions. This is also an area of computer science that emphasizes the creation of intelligent machine language that works and reacts like humans. With this, prediction is faster and cheaper, and it is a fundamental input to decision-making and a relatively newer business strategy. Machine learning is the study of algorithms and statistical models using a computer system to carry out a particular and specific intended activity. Essentially, this can be seen as a subset of artificial intelligence. However, machine learning algorithms build a mathematical model based on sample data in order to make predictions or decisions without being explicitly programmed to perform such a task (<xref ref-type="bibr" rid="B18">18</xref>). This tries to develop learning models primarily based on new optimization methods such as gradient boosting. In particular, machine languages are essentially computer programs that function at the bit/byte level stressing machine components such as logic gates. The goal is to ensure that all computer programs are able to solve problems and achieve success (<xref ref-type="bibr" rid="B19">19</xref>). Machine language or artificial intelligence is utilized to make predictions.</p>
</sec>
<sec id="S9">
<title>9. Human error and society in forecasting and prediction</title>
<p>Humans are naturally worse when it comes to heuristics and biases, large datasets, and through complex interactions when forecasting and predicting. In fact, there is nothing new about tragic accidents being caused by human error. For example, human errors complicate forecasting because natural disasters often happen in the area of human disasters. Now, the nature and the scale of possible hazardous technology mean that human error can have adverse effects around the globe while working with large datasets (<xref ref-type="bibr" rid="B20">20</xref>). However, human errors are better when it comes to small data sets such as children learning to recognize a face and the challenger space shuttle, as these are easy things to remember. In society, forecasting and prediction can be utilized to determine job loss, rise of inequality, involving few large companies, and few countries with an advantage. Regarding the primary cause of defects in forecasting, human error is the key to understanding, also to predicting, and avoiding them. There has been little research done to predict defects in forecasting on the basis of the cognitive errors that cause them (<xref ref-type="bibr" rid="B21">21</xref>).</p>
</sec>
<sec id="S10">
<title>10. Division of labor: humans vs. machines</title>
<p>Utilizing machines for prediction provides a better, faster, and cheaper prediction. Humans create their own predictions involving strategies such as anticipatory shipping for companies and organizations. However, there are precautions for both types of divisions of labor.</p>
<p>The division of labor between humans and computer systems has changed for both technology and humans. There has been a shift from technologies of automation with the aim of disallowing human intervention at nearly all points in the system (<xref ref-type="bibr" rid="B22">22</xref>). For machines, it is important to note that there may be biased datasets, small or incomplete datasets, and artificial intelligence for specific tasks. For humans, we have an enhanced value of human judgment. Computers are only capable of solving tasks within practices in which rules are specified by humans or patterns found in datasets. Humans have the capacity to change practices through creativity and innovation, as these processes are effective in nature. The paradox of this is that even though computers can make rapid change possible, human intervention is still a necessity (<xref ref-type="bibr" rid="B23">23</xref>).</p>
</sec>
<sec id="S11" sec-type="conclusion">
<title>11. Conclusion</title>
<p>In teaching forecasting and analytics along with prediction, there are many similarities. It is critical that academics understand the content that is currently being taught in these courses and develop the most optimal teaching model. These findings illustrate a current gap between teaching analytics and teaching forecasting with a significant variance among the topics taught across programs.</p>
</sec>
</body>
<back>
<ref-list>
<title>References</title>
<ref id="B1"><label>1.</label><citation citation-type="journal"><collab>Merriam-Webster Dictionary.</collab> <source><italic>Predict. <italic>The Merriam-Webster.Com Dictionary</italic>.</italic></source> (<year>2022</year>). Available online at: <ext-link ext-link-type="uri" xlink:href="https://www.merriam-webster.com/dictionary/predict">https://www.merriam-webster.com/dictionary/predict</ext-link></citation></ref>
<ref id="B2"><label>2.</label><citation citation-type="journal"><collab>Merriam-Webster Dictionary.</collab> <source><italic>Forecast. The Merriam-Webster.Com Dictionary.</italic></source> (<year>2022</year>). Available online at: <ext-link ext-link-type="uri" xlink:href="https://www.merriam-webster.com/dictionary/forecast">https://www.merriam-webster.com/dictionary/forecast</ext-link></citation></ref>
<ref id="B3"><label>3.</label><citation citation-type="journal"><person-group person-group-type="author"><name><surname>Mishra</surname> <given-names>S</given-names></name></person-group>. <article-title>Financial management and forecasting using business intelligence and big data analytic tools.</article-title> <source><italic>Int J Financ Eng.</italic></source> (<year>2018</year>) <volume>5</volume>:<issue>1850011</issue>.</citation></ref>
<ref id="B4"><label>4.</label><citation citation-type="journal"><person-group person-group-type="author"><name><surname>Davydenko</surname> <given-names>A</given-names></name> <name><surname>Fildes</surname> <given-names>R.</given-names></name></person-group> <source>Forecast Error Measures: Critical Review and Practical Recommendations. Business Forecasting: Practical Problems and Solutions</source>. (<year>2016</year>).</citation></ref>
<ref id="B5"><label>5.</label><citation citation-type="journal"><person-group person-group-type="author"><name><surname>Hyndman</surname> <given-names>R</given-names></name> <name><surname>Khandakar</surname> <given-names>Y</given-names></name></person-group>. <article-title>Automatic time series forecasting: the forecast package for R.</article-title> <source><italic>J Stat Softw.</italic></source> (<year>2008</year>) <volume>26</volume>:<fpage>1</fpage>&#x2013;<lpage>22</lpage>. <pub-id pub-id-type="doi">10.18637/jss</pub-id> <comment>v027</comment></citation></ref>
<ref id="B6"><label>6.</label><citation citation-type="journal"><person-group person-group-type="author"><name><surname>Hyndman</surname> <given-names>R</given-names></name> <name><surname>Koehler</surname> <given-names>AB</given-names></name> <name><surname>Ord</surname> <given-names>JK</given-names></name> <name><surname>Snyder</surname> <given-names>RD.</given-names></name></person-group> <source><italic>Forecasting With Exponential Smoothing: The State Space Approach.</italic></source> <publisher-loc>Berlin</publisher-loc>: <publisher-name>Springer Science &#x0026; Business Media</publisher-name> (<year>2008</year>).</citation></ref>
<ref id="B7"><label>7.</label><citation citation-type="journal"><person-group person-group-type="author"><name><surname>Brown</surname> <given-names>RG</given-names></name> <name><surname>Meyer</surname> <given-names>RF</given-names></name></person-group>. <article-title>The fundamental theorem of exponential smoothing.</article-title> <source><italic>Operat Res.</italic></source> (<year>1961</year>) <volume>9</volume>:<fpage>673</fpage>&#x2013;<lpage>85</lpage>.</citation></ref>
<ref id="B8"><label>8.</label><citation citation-type="journal"><person-group person-group-type="author"><name><surname>Montgomery</surname> <given-names>DC</given-names></name> <name><surname>Peck</surname> <given-names>EA</given-names></name> <name><surname>Vining</surname> <given-names>GG.</given-names></name></person-group> <source><italic>Introduction to Linear Regression Analysis.</italic></source> <publisher-loc>Hoboken, NJ</publisher-loc>: <publisher-name>John Wiley &#x0026; Sons</publisher-name> (<year>2021</year>).</citation></ref>
<ref id="B9"><label>9.</label><citation citation-type="journal"><person-group person-group-type="author"><name><surname>Li</surname> <given-names>G</given-names></name></person-group>. <article-title>Robust regression.</article-title> <source><italic>Explor Data Tables Trends Shapes.</italic></source> (<year>1985</year>) <volume>281</volume>:<issue>U340</issue>.</citation></ref>
<ref id="B10"><label>10.</label><citation citation-type="journal"><person-group person-group-type="author"><name><surname>McLachlan</surname> <given-names>GJ.</given-names></name></person-group> <source><italic>Discriminant Analysis and Statistical Pattern Recognition.</italic></source> <publisher-loc>Hoboken, NJ</publisher-loc>: <publisher-name>John Wiley &#x0026; Sons</publisher-name> (<year>2005</year>).</citation></ref>
<ref id="B11"><label>11.</label><citation citation-type="journal"><person-group person-group-type="author"><name><surname>Silva</surname> <given-names>A</given-names></name> <name><surname>Stam</surname> <given-names>A.</given-names></name></person-group> <source><italic>Discriminant Analysis.</italic></source> (<year>1995</year>).</citation></ref>
<ref id="B12"><label>12.</label><citation citation-type="journal"><person-group person-group-type="author"><name><surname>Rayens</surname> <given-names>WS.</given-names></name></person-group> <source><italic>Discriminant Analysis and Statistical Pattern Recognition.</italic></source> (<year>1993</year>).</citation></ref>
<ref id="B13"><label>13.</label><citation citation-type="journal"><person-group person-group-type="author"><name><surname>Sinuany-Stern</surname> <given-names>Z.</given-names></name></person-group> <source><italic>Forecasting Methods in Higher Education: An Overview. Handbook of Operations Research and Management Science in Higher Education.</italic></source> (<year>2021</year>).</citation></ref>
<ref id="B14"><label>14.</label><citation citation-type="journal"><person-group person-group-type="author"><name><surname>Suhardi</surname> <given-names>S</given-names></name> <name><surname>Widyastuti</surname> <given-names>T</given-names></name> <name><surname>Bisri</surname> <given-names>B</given-names></name> <name><surname>Prabowo</surname> <given-names>W</given-names></name></person-group>. <article-title>Forecasting analysis of new students acceptance using time series forecasting method.</article-title> <source><italic>Jurnal Akrab Juara.</italic></source> (<year>2019</year>) <volume>4</volume>:<fpage>10</fpage>&#x2013;<lpage>23</lpage>.</citation></ref>
<ref id="B15"><label>15.</label><citation citation-type="journal"><person-group person-group-type="author"><name><surname>Dolgui</surname> <given-names>A</given-names></name> <name><surname>Ivanov</surname> <given-names>D</given-names></name> <name><surname>Sethi</surname> <given-names>SP</given-names></name> <name><surname>Sokolov</surname> <given-names>B</given-names></name></person-group>. <article-title>Scheduling in production, supply chain and industry 4.0 systems by optimal control: fundamentals, state-of-the-art and applications.</article-title> <source><italic>Int J Prod Res.</italic></source> (<year>2019</year>) <volume>57</volume>:<fpage>411</fpage>&#x2013;<lpage>32</lpage>.</citation></ref>
<ref id="B16"><label>16.</label><citation citation-type="journal"><person-group person-group-type="author"><name><surname>Chen</surname> <given-names>ZL</given-names></name> <name><surname>Vairaktarakis</surname> <given-names>GL</given-names></name></person-group>. <article-title>Integrated scheduling of production and distribution operations.</article-title> <source><italic>Manage Sci.</italic></source> (<year>2005</year>) <volume>51</volume>:<fpage>614</fpage>&#x2013;<lpage>28</lpage>.</citation></ref>
<ref id="B17"><label>17.</label><citation citation-type="journal"><person-group person-group-type="author"><name><surname>Haase</surname> <given-names>K.</given-names></name></person-group> <source><italic>Lotsizing and Scheduling for Production Planning.</italic></source> (<volume>Vol. 408</volume>). <publisher-loc>Berlin</publisher-loc>: <publisher-name>Springer Science &#x0026; Business Media</publisher-name> (<year>2012</year>).</citation></ref>
<ref id="B18"><label>18.</label><citation citation-type="journal"><person-group person-group-type="author"><name><surname>Khanzode</surname> <given-names>KCA</given-names></name> <name><surname>Sarode</surname> <given-names>RD</given-names></name></person-group>. <article-title>Advantages and disadvantages of artificial intelligence and machine learning: a literature review.</article-title> <source><italic>Int J Library Inform Sci.</italic></source> (<year>2020</year>) <volume>9</volume>:<issue>3</issue>.</citation></ref>
<ref id="B19"><label>19.</label><citation citation-type="journal"><person-group person-group-type="author"><name><surname>McCarthy</surname> <given-names>J.</given-names></name></person-group> <source><italic>What is Artificial Intelligence.</italic></source> (<year>2004</year>). Available online at: <ext-link ext-link-type="uri" xlink:href="http://www-formal.stanford.edu/jmc/whatisai.html">http://www-formal.stanford.edu/jmc/whatisai.html</ext-link></citation></ref>
<ref id="B20"><label>20.</label><citation citation-type="journal"><person-group person-group-type="author"><name><surname>Reason</surname> <given-names>J.</given-names></name></person-group> <source><italic>Human Error.</italic></source> <publisher-loc>Cambridge</publisher-loc>: <publisher-name>Cambridge University Press</publisher-name> (<year>1990</year>).</citation></ref>
<ref id="B21"><label>21.</label><citation citation-type="journal"><person-group person-group-type="author"><name><surname>Strigini</surname> <given-names>L</given-names></name> <name><surname>Huang</surname> <given-names>F.</given-names></name></person-group> <source><italic>HEDP: A Method for Early Forecasting Software Defects Based on Human Error Mechanisms.</italic></source> (<year>2021</year>).</citation></ref>
<ref id="B22"><label>22.</label><citation citation-type="journal"><person-group person-group-type="author"><name><surname>Ekbia</surname> <given-names>H</given-names></name> <name><surname>Nardi</surname> <given-names>B.</given-names></name></person-group> <source><italic>Heteromation and its (dis) Contents: The Invisible Division of Labor Between Humans and Machines. First Monday.</italic></source> (<year>2014</year>).</citation></ref>
<ref id="B23"><label>23.</label><citation citation-type="journal"><person-group person-group-type="author"><name><surname>Hammersh&#x00F8;j</surname> <given-names>LG</given-names></name></person-group>. <article-title>The new division of labor between human and machine and its educational implications.</article-title> <source><italic>Technol Soc.</italic></source> (<year>2019</year>) <volume>59</volume>:<issue>101142</issue>.</citation></ref>
</ref-list>
</back>
</article>
